Maximum Advance Rate70% – 85% of cost
Contingency10% contingency and interest reserve must be accounted for in the project cost.
Post-Closing Liquidity5-10% of total loan amount (1st+ 2nd mortgage amount), available upon completion of construction.
Third Party Cost ReviewBorrower must agree to third-party cost review, contractor evaluation report, and third-party fund monitoring during construction. All related costs may be included in project cost.
Performance BondBorrower may be asked to provide performance bond from their contractor. Subject to third-party review of contractor.
SBA EligibilityThe borrower must be eligible under the SBA 504 or SBA 504 Green Loan initiative programs.
Maximum LTV For 1st Trust DeedMulti-Purpose50% – 55%(Maximum LTV – Up to 90% ontotal project cost)Hospitality & Special Purpose50% – 55%(Maximum LTV – Up to 85% on total project cost) 
Cash Collateral(May Be Required)Additional cash collateral equivalent to 5% to 10% of the total project cost may be required during the construction phase if the Borrower and Guarantors do not meet the Global Debt Service Coverage Ratio requirements (0.50x-1.00x from surplus cashflow). Cash Collateral will generally be released upon completion of construction and issuance of the SBA 504 debenture.
Additional Hospitality RequirementsMidscale or upper midscale limited-service or select-service franchises only. Property must be located in an economically diverse community with a population >50,000.

Please take a moment to complete the short online form below and we will contact you to discuss your options or call 470-362-7887